Wiki/Guide/Creating Your First RFQ
Guides

Creating Your First RFQ

A step-by-step guide to your first production request on Fabberworks, from file upload to comparing quotes.

RFQOrderGetting StartedQuote

Intro

The RFQ is where production starts on Fabberworks: you upload your file, define your requirements, and receive quotes from matching Creators. This guide helps you build your first request completely.

Prerequisites

Steps

  1. Upload your file. The system analyzes it and reports obvious problems (open mesh, empty drawing) early.
  2. Select the process and material; if unsure, describe the purpose and leave the process to the Creator.
  3. Enter quantity and lead-time expectations. If you may reorder, give a quantity range.
  4. Add tolerance and surface notes only where they genuinely matter.
  5. Publish the request and compare incoming quotes: look at the Creator's questions and DFM notes as much as the price.
  6. Clarify every open point by message before accepting a quote; changes after production starts are costly.

Common Pitfalls

  • Uploading the file and leaving the description empty.
  • Choosing the lowest price over the quote that comes with questions and a plan.
  • Not stating the unit system (mm/inch).
  • Raising critical fit surfaces only after accepting a quote.

Conclusion

A good RFQ keeps the Creator from guessing on your behalf. Give the context up front; quotes get both faster and more accurate.